Projects
Wells Fargo Bank
Project Description
Eleven Wells Fargo Bank Properties - Phase I Environmental Site Assessments and Phase II Subsurface Investigations
Nature of Firm's Responsibilities
Phase I ESAs with follow-up Phase II drilling and testing when required; recommendations for future investigation and/or monitoring if needed.
Shopping Center, Santa Cruz, California
Project Description
Shopping Center - Soil and Groundwater Investigation, Groundwater Monitoring and Remediation
Nature of Firm's Responsibilities
Soil and groundwater investigation; exploratory excavations using pitting and trenching; soil borings and monitoring well installation; groundwater monitoring; development and implementation of remediation strategies; investigation of potential contamination from dry-cleaning solvents.
Suisun Valley Elementary School
Project Description
Soil Remediation Project
Nature of Firm's Responsibilities
Project management and oversight of the excavation and disposal of 22,000 tons of soil; soil sampling and analysis; preparation and implementation of Health and Safety Plan with emphasis on dust control; daily air monitoring; Storm Water Pollution Prevention Plan.
Fairfield Medical Arts Center
Project Description
Surveys for Asbestos, Lead, Mercury and Mold
Nature of Firm's Responsibilities
Phase I ESA of 40,000 sq ft vacant medical facility; pre-demolition asbestos survey; lead-based paint and lead in drinking water surveys; mercury survey; microbiological (mold) survey; indoor air quality survey; recommendations for follow-up testing and/or abatement; additional Phase I ESA of two residential properties.
Former Gasoline Service Station, Vallejo, California
Project Description
Tank Removal/Remediation and Case Closure
Nature of Firm's Responsibilities
Soil borings and exploratory trenching; tank removal; characterization and remediation of contaminated soil and groundwater, backfilling and soil compaction; groundwater monitoring; case closure request; well abandonment.
Former Auto Camp, Vacaville, California
Project Description
Phase I and II/Groundwater Monitoring
Nature of Firm's Responsibilities
Phase I ESA; Phase II and follow-up subsurface investigation; tank removal and soil excavation; monitoring well installation and groundwater monitoring; sensitive receptor survey; case closure request; well abandonment.